Thermal Oil Plant Steel, Meadow Lake

Thermal Oil Plant Steel, Meadow Lake

GSEI Scope

Steel design, drafting, and field reviews of:

40 m (130 ft) high, 10 storey steel frame supporting:

  • Convection Heater: 2,450 kN (550,000 lbs)
  • Radiant Heater: 820 kN (184,000 lbs)
  • Flue Gas Reversion: 600 kN (136,000 lbs)
  • Flue Gas Ducting: 415 kN (93,000 lbs)
  • Expansion Tank (full): 425 kN (95,000 lbs)
  • Single Cell Cyclone: 67 kN (15,000 lbs)
  • Disc Screen and Conveyor (full): 300 kN (67,000 lbs)

Pipe supports, pipe bridge, and access platforms

Concrete foundation design, drafting, and field  reviews of:

18 m x 22 m (59 ft x 73 ft) pile cap with 147 driven piles

Two 1 m thick x 4 m high x 16 m long (3.25 ft x 12.75 ft x 53 ft) combustion chamber walls supporting:

  • Combustion Chamber (full): 3,100 kN (697,000 lbs)
  • Fuel Pusher (full): 170 kN (38,000 lbs)
Expansion tank, 10th floor
West elevation
North-west elevation
5th floor framing and bracing
1st floor framing and duct support
Auxiliary multi-cyclone support frame and ducting
East elevation and stair tower