Thermal Oil Plant Pile Cap, Meadow Lake

Thermal Oil Plant Pile Cap, Meadow Lake

GSEI Scope

Concrete foundation design, drafting, and field reviews of:

18 m x 22 m (59 ft x 73 ft) pile cap with 147 driven piles

Two 1 m thick x 4 m high x 16 m long (3.25 ft x 12.75 ft x 53 ft) combustion chamber walls supporting:

  • Combustion Chamber (full): 3,100 kN (697,000 lbs)  
  • Fuel Pusher (full): 170 kN (38,000 lbs)
Piles, anchor rods and pile cap lower mat reinforcing
Combustion chamber wall dowels
Pile cap reinforcing
Completed walls
Combustion chamber installed