•   Turbo Generator Casing Lift

    Turbo Generator Casing Lift

  •   Two Cranes Lifting and Rotating the Casing

    Two Cranes Lifting and Rotating the Casing

  •   Detailed Lifting Procedure

    Detailed Lifting Procedure

Lift and Invert 75,000 lb Turbo Generator Casing

Design of steel brackets and detailed rigging procedures to lift and invert a 75,000 lb turbo generator casing for maintenance.

The casing had to be rotated and inverted in the air by two cranes in order to achieve the proper orientation in its final position.

GSEI in Prince George